{"id":2675,"date":"2025-08-29T14:24:25","date_gmt":"2025-08-29T13:24:25","guid":{"rendered":"https:\/\/guisboroughecogroup.co.uk\/blog\/?p=2675"},"modified":"2026-08-20T12:14:47","modified_gmt":"2026-08-20T11:14:47","slug":"energy-recovery-facility-erf-in-sutton-complaint-from-the-council","status":"publish","type":"post","link":"https:\/\/guisboroughecogroup.co.uk\/blog\/2025\/08\/29\/energy-recovery-facility-erf-in-sutton-complaint-from-the-council\/","title":{"rendered":"Energy Recovery Facility (ERF) in Sutton: Complaint from the council"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The Leader of the council wrote this complaint about an ERF is managed by the company chosen to manage the TV ERF, Viridor. Let us hope that our council leader will take note and vote to abandon TV ERF as soo as possible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Councillor Barry Lewis<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Leader of the Council<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Councillor Christopher Woolmer<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lead Member for the Environment<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">London Borough of Sutton<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Email: leadership.office@sutton.gov.uk<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Rt Hon Steve Reed OBE MP<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Secretary of State for Environment, Food and Rural Affairs<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Seacole Building<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2 Marsham Street<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">London SW1P 4DF<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Letter sent by email to: secretary.state@defra.gov.uk<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Date: 22 August 2025<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dear Secretary of State,<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We are writing to you today on behalf of the residents of the London Borough of Sutton regarding recent developments at the Beddington Energy Recovery Facility (ERF) in Sutton. The site is operated and managed by Viridor and monitored by the Environment Agency (EA).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A recent Compliance Assessment Report (CAR) issued by the EA has concluded that Viridor breached its permit conditions at the Beddington site. The report states that between September 2022 and March 2024, there were 916 (a combined figure from the site&#8217;s two waste processing lines) occasions when the site exceeded the daily emissions limit value for the amount of Oxides of Nitrogen (NOx) going into the atmosphere.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Council has been told by Viridor and the EA that the number of exceedances does not breach<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">legal air quality limits. We also acknowledge that the UK Health Security Agency concludes that the emissions are unlikely to have caused harm to human health or the environment. However, for our residents who live in the area, this news will still be deeply troubling following other recent incidentsand outages at the Beddington site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What is also concerning is the lack of proper monitoring and scrutiny by the EA of the data they received from Viridor. In order for these sites to run as required legally, it is important that our residents have confidence in the ability of government regulators. This report only contributes to the erosion of that trust.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We are also informed that as a result of these breaches, Viridor\u2019s compliance rating at the Beddington site is likely to be downgraded from a rating of A to E. You will understand the impact this will have on residents\u2019 confidence in how the ERF is managed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Despite this report and the downgrading of Viridor\u2019s rating, we are aware that the EA is still considering approving plans for Viridor to treat more waste at the Beddington site. The Council is on record as opposing any increases and we are astonished that the EA is still even considering this.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This would be the wrong decision in light of this Compliance Assessment Report from the EA itself.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As a much-respected former council leader of an authority neighbouring the Beddington ERF site, and now Secretary of State and MP for Streatham &amp; Croydon North constituency, you will be very aware of the concerns that local residents have about ERF facilities situated within their communities. Therefore, we call on your Department to ensure that:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">the EA publicly reassures residents that there is no public health risk.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u25cf<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">the EA takes strong and appropriate enforcement action against Viridor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u25cf<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">the EA changes its processes and obtains independent monitoring of these sites that is then<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">made publicly available.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u25cf<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">the EA commits to inspecting the Beddington site more frequently.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We see this as the only way in which public trust can be restored locally.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We would also like a clear explanation from your Department to our residents on three critical<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">points:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u25cf<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">How will the EA reassure our residents there is no health impact from these exceedances?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u25cf<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Why is the EA still contemplating giving permission for more waste to be treated at<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Beddington, especially in light of Viridor&#8217;s proven breaches and downgraded compliance<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">rating?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u25cf<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What concrete steps will the EA be taking to ensure Viridor provides transparent and regular communications to residents in the local area, who are now deeply concerned about Viridor\u2019s ability to manage the site safely and responsibly?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We look forward to your urgent response to these matters.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Yours sincerely,<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Councillor Barry Lewis<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Leader of the Council<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Councillor Christopher Woolmer<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lead Member for the Environment<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Leader of the council wrote this complaint about an ERF is managed by the company chosen to manage the TV ERF, Viridor. Let us hope that our council leader will take note and vote to abandon TV ERF as soo as possible. Councillor Barry Lewis Leader of the Council Councillor Christopher Woolmer Lead Member [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[181,145,158],"tags":[167,168,166,159],"class_list":["post-2675","post","type-post","status-publish","format-standard","hentry","category-eco-group-cat","category-incinerator","category-tverf","tag-ea","tag-health","tag-viridor","tag-incinerator"],"rttpg_featured_image_url":null,"rttpg_author":{"display_name":"Fred Page","author_link":"https:\/\/guisboroughecogroup.co.uk\/blog\/author\/fredpage\/"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/guisboroughecogroup.co.uk\/blog\/category\/eco-group-cat\/\" rel=\"category tag\">Category: Eco Group<\/a> <a href=\"https:\/\/guisboroughecogroup.co.uk\/blog\/category\/incinerator\/\" rel=\"category tag\">Incinerator<\/a> <a href=\"https:\/\/guisboroughecogroup.co.uk\/blog\/category\/tverf\/\" rel=\"category tag\">TVERF<\/a>","rttpg_excerpt":"The Leader of the council wrote this complaint about an ERF is managed by the company chosen to manage the TV ERF, Viridor. Let us hope that our council leader will take note and vote to abandon TV ERF as soo as possible. Councillor Barry Lewis Leader of the Council Councillor Christopher Woolmer Lead Member&hellip;","_links":{"self":[{"href":"https:\/\/guisboroughecogroup.co.uk\/blog\/wp-json\/wp\/v2\/posts\/2675","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/guisboroughecogroup.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/guisboroughecogroup.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/guisboroughecogroup.co.uk\/blog\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/guisboroughecogroup.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=2675"}],"version-history":[{"count":1,"href":"https:\/\/guisboroughecogroup.co.uk\/blog\/wp-json\/wp\/v2\/posts\/2675\/revisions"}],"predecessor-version":[{"id":2676,"href":"https:\/\/guisboroughecogroup.co.uk\/blog\/wp-json\/wp\/v2\/posts\/2675\/revisions\/2676"}],"wp:attachment":[{"href":"https:\/\/guisboroughecogroup.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=2675"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/guisboroughecogroup.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=2675"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/guisboroughecogroup.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=2675"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}